{"id":2911,"date":"2025-06-22T19:20:49","date_gmt":"2025-06-22T17:20:49","guid":{"rendered":"https:\/\/avaengineering.bg\/?p=2911"},"modified":"2025-08-11T20:14:29","modified_gmt":"2025-08-11T18:14:29","slug":"calculating-a-metal-structure","status":"publish","type":"post","link":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/","title":{"rendered":"Calculating a Metal Structure"},"content":{"rendered":"<div class=\"wpb-content-wrapper\" id=\"wpb-content-root\"><p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>Calculating a Metal Structure \u2013 Key Steps and Professional Approach<\/h2>\n<p>Designing and manufacturing a <a href=\"https:\/\/avaengineering.bg\/%d1%83%d1%81%d0%bb%d1%83%d0%b3%d0%b8\/%d0%b8%d0%b7%d1%80%d0%b0%d0%b1%d0%be%d1%82%d0%ba%d0%b0-%d0%bd%d0%b0-%d0%bc%d0%b5%d1%82%d0%b0%d0%bb%d0%bd%d0%b8-%d0%b8%d0%b7%d0%b4%d0%b5%d0%bb%d0%b8%d1%8f\/\">metal structure<\/a> starts with a critical stage \u2013 precise calculation. This process ensures that the construction will be strong, stable, and optimized for its intended application. At Ava Engineering 2018 Ltd., we approach the calculation of metal structures with attention to every detail, combining engineering expertise with modern software technologies.<\/p>\n<h3>Why is metal structure calculation important?<\/h3>\n<p>The calculation defines the dimensions, material thickness, type of profiles, and the way they will be joined. Without this step, there is a risk of underestimating or overestimating the design, which can lead to reduced strength or unnecessary costs. Properly performed calculations ensure:<\/p>\n<ul>\n<li>Optimal strength and stability<\/li>\n<li>Material and cost savings<\/li>\n<li>Compliance with safety standards<\/li>\n<li>Long service life of the construction<\/li>\n<\/ul>\n<h3>What does the calculation process involve?<\/h3>\n<p><strong>1. Gathering project data<\/strong><br \/>\nWe start by analyzing your project requirements \u2013 dimensions, load capacity, operating conditions, and purpose. For example, whether the construction will be for a warehouse, hall, roof, or other use.<\/p>\n<p><strong>2. Choosing the right material and profiles<\/strong><br \/>\nThe type of steel or other metals, as well as the profiles used (square tubes, I-beams, channels), are determined based on the required strength and weight of the structure.<\/p>\n<p><strong>3. Load analysis<\/strong><br \/>\nWe consider all possible loads \u2013 own weight, snow, wind, dynamic forces. This helps us ensure that the structure will withstand various environmental influences.<\/p>\n<p><strong>4. Creating a 3D model and structural drawings<\/strong><br \/>\nOur engineers use specialized CAD software to visualize the construction and perform precise calculations.<\/p>\n<p><strong>5. Final project and production preparation<\/strong><br \/>\nOnce the calculation is complete, we prepare detailed drawings and production instructions to ensure accurate execution.<\/p>\n<h3>Flexible solutions for different projects<\/h3>\n<p>At Ava Engineering, we can design metal structures of various sizes and configurations \u2013 from small auxiliary facilities to large industrial halls. Our experience allows us to offer solutions for both standard and custom projects, fully tailored to your needs.<\/p>\n<h3>Competitive prices and high quality<\/h3>\n<p>By optimizing the design and selecting the right materials, we ensure competitive prices without compromising quality. We work with trusted suppliers and modern production equipment.<\/p>\n<h4>Need calculation and design for a metal structure?<\/h4>\n<p>Contact us today \u2013 our team will prepare an individual offer that includes all stages \u2013 from calculation and design to manufacturing and installation.<\/p>\n<p>\ud83d\udcde <a href=\"tel:+359878102033\">+359 878 102 033<\/a><br \/>\n\ud83d\udce7 <a href=\"mailto:office@avaengineering.bg\">office@avaengineering.bg<\/a>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>At Ava Engineering 2018 Ltd., we approach the calculation of metal structures with attention to every detail, combining engineering expertise with modern software technologies.<\/p>\n","protected":false},"author":1,"featured_media":2913,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[53],"tags":[110],"class_list":["post-2911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-constructions","tag-calculating-a-metal-structure","category-53","description-off"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Calculating a Metal Structure \u2013 Key Steps and Professional Approach<\/title>\n<meta name=\"description\" content=\"At Ava Engineering 2018 Ltd., we approach the calculation of metal structures with attention to every detail, combining engineering expertise with modern software technologies.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Calculating a Metal Structure \u2013 Key Steps and Professional Approach\" \/>\n<meta property=\"og:description\" content=\"At Ava Engineering 2018 Ltd., we approach the calculation of metal structures with attention to every detail, combining engineering expertise with modern software technologies.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/\" \/>\n<meta property=\"og:site_name\" content=\"M\u0435\u0442\u0430\u043b\u043d\u0438 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u0438 \u0438 \u043c\u0435\u0442\u0430\u043b\u043d\u0438 \u0438\u0437\u0434\u0435\u043b\u0438\u044f\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/avaengineering2018\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-22T17:20:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-11T18:14:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/avaengineering.bg\/wp-content\/uploads\/2025\/08\/izchislyavane-na-metalna-konstrukcia.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"zoran1209\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"zoran1209\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/\"},\"author\":{\"name\":\"zoran1209\",\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/#\\\/schema\\\/person\\\/eb8d851dfcc890732a775f3db5c4e4ee\"},\"headline\":\"Calculating a Metal Structure\",\"datePublished\":\"2025-06-22T17:20:49+00:00\",\"dateModified\":\"2025-08-11T18:14:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/\"},\"wordCount\":394,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/avaengineering.bg\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/izchislyavane-na-metalna-konstrukcia.webp\",\"keywords\":[\"Calculating a Metal Structure\"],\"articleSection\":[\"Constructions\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/\",\"url\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/\",\"name\":\"Calculating a Metal Structure \u2013 Key Steps and Professional Approach\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/avaengineering.bg\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/izchislyavane-na-metalna-konstrukcia.webp\",\"datePublished\":\"2025-06-22T17:20:49+00:00\",\"dateModified\":\"2025-08-11T18:14:29+00:00\",\"description\":\"At Ava Engineering 2018 Ltd., we approach the calculation of metal structures with attention to every detail, combining engineering expertise with modern software technologies.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/#primaryimage\",\"url\":\"https:\\\/\\\/avaengineering.bg\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/izchislyavane-na-metalna-konstrukcia.webp\",\"contentUrl\":\"https:\\\/\\\/avaengineering.bg\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/izchislyavane-na-metalna-konstrukcia.webp\",\"width\":1536,\"height\":1024,\"caption\":\"\u0418\u0437\u0447\u0438\u0441\u043b\u044f\u0432\u0430\u043d\u0435 \u043d\u0430 \u043c\u0435\u0442\u0430\u043b\u043d\u0430 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u044f\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/calculating-a-metal-structure\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u041d\u0430\u0447\u0430\u043b\u043e\",\"item\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Calculating a Metal Structure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/\",\"name\":\"\u0418\u0437\u0433\u0440\u0430\u0436\u0434\u0430\u043d\u0435 \u043d\u0430 \u043c\u0435\u0442\u0430\u043b\u043d\u0438 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u0438\",\"description\":\"\u0410\u0432\u0430 \u0418\u043d\u0436\u0435\u043d\u0435\u0440\u0438\u043d\u0433 2018\",\"publisher\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/#organization\",\"name\":\"\u0418\u0437\u0433\u0440\u0430\u0436\u0434\u0430\u043d\u0435 \u043d\u0430 \u043c\u0435\u0442\u0430\u043b\u043d\u0438 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u0438\",\"url\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/avaengineering.bg\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logox2-ava-1.webp\",\"contentUrl\":\"https:\\\/\\\/avaengineering.bg\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logox2-ava-1.webp\",\"width\":242,\"height\":80,\"caption\":\"\u0418\u0437\u0433\u0440\u0430\u0436\u0434\u0430\u043d\u0435 \u043d\u0430 \u043c\u0435\u0442\u0430\u043b\u043d\u0438 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u0438\"},\"image\":{\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/avaengineering2018\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/#\\\/schema\\\/person\\\/eb8d851dfcc890732a775f3db5c4e4ee\",\"name\":\"zoran1209\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d0506908b78ac92596d958e64829a0c4409cbb2e20738c7bc9775635843b54d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d0506908b78ac92596d958e64829a0c4409cbb2e20738c7bc9775635843b54d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d0506908b78ac92596d958e64829a0c4409cbb2e20738c7bc9775635843b54d?s=96&d=mm&r=g\",\"caption\":\"zoran1209\"},\"sameAs\":[\"https:\\\/\\\/v1.avaengineering.bg\"],\"url\":\"https:\\\/\\\/avaengineering.bg\\\/en\\\/author\\\/zoran1209\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Calculating a Metal Structure \u2013 Key Steps and Professional Approach","description":"At Ava Engineering 2018 Ltd., we approach the calculation of metal structures with attention to every detail, combining engineering expertise with modern software technologies.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/","og_locale":"en_US","og_type":"article","og_title":"Calculating a Metal Structure \u2013 Key Steps and Professional Approach","og_description":"At Ava Engineering 2018 Ltd., we approach the calculation of metal structures with attention to every detail, combining engineering expertise with modern software technologies.","og_url":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/","og_site_name":"M\u0435\u0442\u0430\u043b\u043d\u0438 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u0438 \u0438 \u043c\u0435\u0442\u0430\u043b\u043d\u0438 \u0438\u0437\u0434\u0435\u043b\u0438\u044f","article_publisher":"https:\/\/www.facebook.com\/avaengineering2018\/","article_published_time":"2025-06-22T17:20:49+00:00","article_modified_time":"2025-08-11T18:14:29+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/avaengineering.bg\/wp-content\/uploads\/2025\/08\/izchislyavane-na-metalna-konstrukcia.webp","type":"image\/webp"}],"author":"zoran1209","twitter_card":"summary_large_image","twitter_misc":{"Written by":"zoran1209","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/#article","isPartOf":{"@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/"},"author":{"name":"zoran1209","@id":"https:\/\/avaengineering.bg\/en\/#\/schema\/person\/eb8d851dfcc890732a775f3db5c4e4ee"},"headline":"Calculating a Metal Structure","datePublished":"2025-06-22T17:20:49+00:00","dateModified":"2025-08-11T18:14:29+00:00","mainEntityOfPage":{"@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/"},"wordCount":394,"commentCount":0,"publisher":{"@id":"https:\/\/avaengineering.bg\/en\/#organization"},"image":{"@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/#primaryimage"},"thumbnailUrl":"https:\/\/avaengineering.bg\/wp-content\/uploads\/2025\/08\/izchislyavane-na-metalna-konstrukcia.webp","keywords":["Calculating a Metal Structure"],"articleSection":["Constructions"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/","url":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/","name":"Calculating a Metal Structure \u2013 Key Steps and Professional Approach","isPartOf":{"@id":"https:\/\/avaengineering.bg\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/#primaryimage"},"image":{"@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/#primaryimage"},"thumbnailUrl":"https:\/\/avaengineering.bg\/wp-content\/uploads\/2025\/08\/izchislyavane-na-metalna-konstrukcia.webp","datePublished":"2025-06-22T17:20:49+00:00","dateModified":"2025-08-11T18:14:29+00:00","description":"At Ava Engineering 2018 Ltd., we approach the calculation of metal structures with attention to every detail, combining engineering expertise with modern software technologies.","breadcrumb":{"@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/#primaryimage","url":"https:\/\/avaengineering.bg\/wp-content\/uploads\/2025\/08\/izchislyavane-na-metalna-konstrukcia.webp","contentUrl":"https:\/\/avaengineering.bg\/wp-content\/uploads\/2025\/08\/izchislyavane-na-metalna-konstrukcia.webp","width":1536,"height":1024,"caption":"\u0418\u0437\u0447\u0438\u0441\u043b\u044f\u0432\u0430\u043d\u0435 \u043d\u0430 \u043c\u0435\u0442\u0430\u043b\u043d\u0430 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u044f"},{"@type":"BreadcrumbList","@id":"https:\/\/avaengineering.bg\/en\/calculating-a-metal-structure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u041d\u0430\u0447\u0430\u043b\u043e","item":"https:\/\/avaengineering.bg\/en\/"},{"@type":"ListItem","position":2,"name":"Calculating a Metal Structure"}]},{"@type":"WebSite","@id":"https:\/\/avaengineering.bg\/en\/#website","url":"https:\/\/avaengineering.bg\/en\/","name":"\u0418\u0437\u0433\u0440\u0430\u0436\u0434\u0430\u043d\u0435 \u043d\u0430 \u043c\u0435\u0442\u0430\u043b\u043d\u0438 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u0438","description":"\u0410\u0432\u0430 \u0418\u043d\u0436\u0435\u043d\u0435\u0440\u0438\u043d\u0433 2018","publisher":{"@id":"https:\/\/avaengineering.bg\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/avaengineering.bg\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/avaengineering.bg\/en\/#organization","name":"\u0418\u0437\u0433\u0440\u0430\u0436\u0434\u0430\u043d\u0435 \u043d\u0430 \u043c\u0435\u0442\u0430\u043b\u043d\u0438 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u0438","url":"https:\/\/avaengineering.bg\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/avaengineering.bg\/en\/#\/schema\/logo\/image\/","url":"https:\/\/avaengineering.bg\/wp-content\/uploads\/2024\/10\/logox2-ava-1.webp","contentUrl":"https:\/\/avaengineering.bg\/wp-content\/uploads\/2024\/10\/logox2-ava-1.webp","width":242,"height":80,"caption":"\u0418\u0437\u0433\u0440\u0430\u0436\u0434\u0430\u043d\u0435 \u043d\u0430 \u043c\u0435\u0442\u0430\u043b\u043d\u0438 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u0438"},"image":{"@id":"https:\/\/avaengineering.bg\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/avaengineering2018\/"]},{"@type":"Person","@id":"https:\/\/avaengineering.bg\/en\/#\/schema\/person\/eb8d851dfcc890732a775f3db5c4e4ee","name":"zoran1209","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d0506908b78ac92596d958e64829a0c4409cbb2e20738c7bc9775635843b54d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d0506908b78ac92596d958e64829a0c4409cbb2e20738c7bc9775635843b54d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d0506908b78ac92596d958e64829a0c4409cbb2e20738c7bc9775635843b54d?s=96&d=mm&r=g","caption":"zoran1209"},"sameAs":["https:\/\/v1.avaengineering.bg"],"url":"https:\/\/avaengineering.bg\/en\/author\/zoran1209\/"}]}},"_links":{"self":[{"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/posts\/2911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/comments?post=2911"}],"version-history":[{"count":3,"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/posts\/2911\/revisions"}],"predecessor-version":[{"id":2919,"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/posts\/2911\/revisions\/2919"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/media\/2913"}],"wp:attachment":[{"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/media?parent=2911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/categories?post=2911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/avaengineering.bg\/en\/wp-json\/wp\/v2\/tags?post=2911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}